In University Facilities' ongoing effort to maintain and enhance the University, scheduled work that involves a change in the campus environment affecting our departments, students and staff will occur.
For specific information on individual notifications, please contact the person listed on the notification. Please call University Facilities Customer Service at 645-2025 for general information.
Bookmark our page for the most comprehensive and up-to-date information available. If you wish to receive University Facilities notifications by e-mail, please visit the following link to sign up.
- Baird Hall --Ceiling Tile and Light Replacement
- 1/19/10 through 3/22/10 --Baird Hall (Hallways only) Ceiling Tiles and Light Replacement
- Baird Hall --Rehab Work
- 1/15/10 through 3/12/10 --Baird Hall Lobby Rehab Work
- Beane Center --Electrical Power Shutdown
- 4/2/10 5:00pm until 4/4/10 midnight --John Beane Center Electrical Power Shutdown
- Biomedical Education Building --Fire Alarm Testing
- 3/8/10 through 3/12/10 7:00am until 3:00pm --Biomedical Education Building --Fire Alarm Testing
- Biomedical Research Building --Rehab Work
- UPDATE: EXTENDED 1/25/10 through 3/31/10 --Biomedical Research Building Rehab Work
- Capen --Restrooms Closed
- 3/8/10 through 3/12/10 --Capen Men's Restroom 105, Women's Restroom 103 Closed
- Capen, Norton, Talbert --Fire Alarm Testing
- 3/11/10 6:00am until 6:30am --Capen, Norton, Talbert Fire Alarm Testing
- Cary Hall --Stairway Closure
- 2/10/10 through 3/26/10 --Cary Hall Staircase Next to the Loading Dock Closed
- Crofts Hall --Elevator Upgrades
- 1/25/10 through 4/12/10 --Crofts Hall Elevator Upgrades
- Fargo, Porter, Red Jacket, Wilkeson --HVAC Shutdown
- 3/8/10 through 3/12/10 --Fargo Building 1, Porter Buildings 2 & 3, Red Jacket Building 1, Wilkeson Building 1 -First Floor HVAC Shutdown
- Harriman Hall- Elevator Floor Repair
- 3/13/2010-3/15/2010- Harriman Hall- Elevator Floor Repair 8:00am Saturday - 8:00am Monday
- Harriman Quadrangle- Site Improvements
- 3/15/2010-6/25/2010- (eather permitting)- Harriman Quadrangle- Site Improvements 7:00am-5:00pm M-F
- Lockwood --Exterior Masonry Repairs
- 3/10/10 through 4/30/10 --Lockwood Library Exterior Masonry Repairs
- North Campus --Audubon Traffic
- 2/18/10 through 5/1/10 --North Campus, Increase in Audubon Parkway Commercial Truck Traffic
- North Campus --Utility Infrastructure Build-out
- 6/22/09 through 7/1/11 --North Campus Utility Infrastructure Build-out
- Norton Hall --Elevator Upgrades
- 1/18/10 through 4/1/10 --Norton Hall Elevator Shutdown
- O'Brian Hall- 5th & 6th floor repairs
- 3/15/2010-4/16/2010 (weather permitting)= O'Brian Hall- repair window, interior finishes, and brick facing- 7:00am - 5:00PM M-F
- Park Hall --Rehab Work
- 2/15/10 through 3/26/10 --Park Hall Rehab Work
- Porter Quadrangle- Hot Water Shutdown
- 3/12/10- Porter Quadrangle - hot water shutdown 8:00am-4:30 pm
- Richmond Quad --Hot and Cold Water Shutdown
- 3/11/10 8:30am until 4:30pm --Richmond Quad Hot and Cold Water Shutdown
- Sherman Hall --Elevator Upgrades
- 2/1/10 through 4/23/10 --Sherman Hall Elevator Upgrades
- Squire Hall- Domestic water shutdown
- 3/11/10-3/12/10- Squire Hall -domestic water shutdown- 12:00am -6:00am
- Squire Hall- Elevator #2 shutdown
- 3/10/2010-3/18/2010- Squire Hall- Elevator #2 shutdown- Cable repair
- Wilkeson Quad --Stairway Closure
- 2/10/10 through 4/9/10 --Wilkeson Quad Building 6 Northwest Stairway Closed